Construction of the 10-km section of the Batumi-Akhaltsikhe connecting road in Shuakhevi. Due to the terrain and the nature of the works, the project is loaded with various types of engineering challenges. Within the framework of the project, the road was widened, reinforced concrete constructions and bridges were arranged, a new layer of asphalt was also laid on the whole section.​

      ONGOING

  • START DATE: 17.02.2023
  • COMPLETION DATE: 30.05.2024